Skip to content

Vertex Manufacturing

Manufacturing

Unifying Operations Across 4 Plants with a Custom ERP

Vertex Manufacturing ran four plants on a patchwork of legacy desktop software, spreadsheets, and manual registers.

Results at a glance

  • Month-end close time

    9 to 2 days

  • Order processing time

    -63%

  • Manual data entry effort

    -70%

The challenge

Vertex, an auto-components maker with four plants across the NCR and Pune, had outgrown its systems: each plant ran its own ageing desktop ERP, procurement lived in email and Excel, and finance re-keyed plant reports into Tally every month. Month-end close routinely stretched past nine working days, and leadership had no consolidated view of work-in-progress, raw material exposure, or plant-level profitability. An off-the-shelf ERP had been evaluated twice and rejected because of licence cost and its inability to model job-work and subcontracting flows.

Our approach

  1. Ran a six-week discovery across all four plants, mapping every material and document flow before writing code
  2. Built a modular ERP on .NET 8 and PostgreSQL with a React front end designed for the shop floor: large touch targets, barcode-first workflows, and offline tolerance
  3. Delivered production planning, stores and inventory, procurement, quality, dispatch, and finance modules with a two-way Tally integration
  4. Containerised the platform with Docker on Azure, with each plant syncing to a central instance and handheld barcode scanners replacing manual registers
  5. Phased the rollout from a Manesar pilot to all four sites within eleven months, with train-the-trainer programs for supervisors

The results

We designed and rolled out a custom ERP that unified production, inventory, procurement, and finance into a single real-time platform.

Month-end close time
9 to 2 days
Inventory accuracy
99.2%
Order processing time
-63%
Manual data entry effort
-70%

Built with

  • .NET 8
  • React
  • PostgreSQL
  • Azure
  • Docker
  • Tally Integration

Talk to the engineers who'd do the work.

A 30-minute call with a senior engineer, no slides. You leave with a clear next step.